栖息谷-管理人的网上家园

[组织变革] [原创]Weighted Average Lead Time (WALT) ( Days )

[复制链接] 0
回复
3653
查看
打印 上一主题 下一主题
楼主
跳转到指定楼层
分享到:
发表于 2010-12-9 11:36:24 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式

Weighted Average Lead Time (WALT) ( Days )

 

Let's see if I can still calculate WALT correctly. It's been a while.

1. In Excel make column heading- Item #, lead time (days), Std Cost, Est Annual Usage,Est Annual $, Lead Time X Est Annual $.

2. List all of your SKUs under "Item #" and populate the next 3 colums with respective data from your information system or records.

3. Find your estimated annual $ (spend) by multiplying "estimated annual usage" X "Std Cost".

4. Find LT (lead time) X "Est Annual $" by multiplying those fields.

5. At the bottom of your worksheet, sum "Est Annual $" and "LT X EA $".

6. Divide "LT X EA $" by "Est Annual $" to find your WALT in days.

If anyone sees an adjustment to the logic/ math that needs to be made, please jump in. I'm 98% sure this is the correct way to calculate the WALT. I've nver calcualted WAPT, but I would assume same logic, different variables. Let me know if trhis helps!

这是我从网上查到的,不知道有没有其他的算法。

使用高级回帖 (可批量传图、插入视频等)快速回复

您需要登录后才可以回帖 登录 | 加入

本版积分规则   Ctrl + Enter 快速发布  

发帖时请遵守我国法律,网站会将有关你发帖内容、时间以及发帖IP地址等记录保留,只要接到合法请求,即会将信息提供给有关政府机构。
快速回复 返回顶部 返回列表