栖息谷-管理人的网上家园

[原创]请问什么是8D,谁能给我个8D表单

[复制链接] 1
回复
2288
查看
打印 上一主题 下一主题
楼主
跳转到指定楼层
分享到:
发表于 2006-11-6 21:36:22 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式

请求帮助!!!

我的邮箱是hechuangsong@sina,com

我的QQ是327571953!!!

请知道的同仁帮帮忙啊!!!!

沙发
发表于 2006-11-6 23:01:12 | 只看该作者

下面是我用www.baidu.com搜索到的,请今后学会使用www.baidu.com这个工具。

栖息谷学习成长快乐.

8D报告详细解释

D1 CA Team Members:
        _____ Name the champion (will accept responsibility for completing 8D
              确定8D的主导者.
        _____ Are the sub-suppliers named as part of the team (previous operations)?
              分包商是否被列在8D功能小组中.
        _____ Is the customer named as part of the team?
              客户是否被列在8D功能小组中.
        _____ Are all personnel directly responsible for steps 3 and 7 on team?
              是否组内所有的人对8D中第3到第7个D都有责任.
        _____ Has the team met prior to the 8D being written and signed?
              8D Report 起草/签核前小组成员是否开过会/碰头.
        _____ Has the team brainstormed the 8D response?
              小组成员是否对8D进行过头脑风暴式的集思广益.

D2 Describe the Problem:
        _____ State the problem from the customers’ perspective. What did they see? Fail Mode?
              以客户的角度/观点陈述问题, 客户看到的是什么?什么样的失效模式.
        _____ State all the known data given by the customer, including location and reference number.
              以客户的朮语描述问题,包括发生的位置,参考数量等.
        _____ State the date code(s) of the product affected and Customer reported date.
              阐明受影响产品的 date code,及客户反映日期.
        _____ State the lot numbers of the product affected (if known
              阐明受影响产品的lot numbers.
        _____ State if there has been more than one (1) occurrence of the problem.
              说明此问题是否是第一次发生.
        _____ State the specification requirements (if applicable
              阐明规格需求.
        _____ State the verification results of electrical or mechanical evaluation.
              阐明电性或机构方面的验证结果.

D3 Implementation and Verify Interim (containment) Actions:
        _____ All stock locations were purged of suspect stock.
     ( ___ Suppliers site; Sub-supplier;  Customers site; ___ Next customer; ___ Other ___ )
     清除/筛选所有可疑的库存. 库存地包括﹕供货商﹐客户正在使用供货商的分包商﹐客户﹐客户的客户及     其它可能存放产品的地点
        _____ The dates of the containment action are listed (by date code, lot #s, month,
        quarter, etc.)
              罗列所有牵制行动的相关日期.(周,月,季度)
        _____ Inspection results list the ___ # sorted; ___ # found; ___ % defective
              列出检验的结果,包括检验数量,不良数量.
        _____ The method of inspection is: ___ ; any special procedures/instructions have been
        documented?
              列出检验方法,任何检验程序/说明都要存盘.
        _____ Short term corrective actions are listed.
              列出短期改善行动及牵制计划(列出与当前产品制程相比不同的部分)

D4 Define and Verify Root Cause(s):
        _____ Fishbone analysis considered and completed (if applicable
              完成了鱼骨图分析.
        _____ Product Analysis Report is completed (if applicable
              完成了产品分析报告.
        _____ Stated root cause is true root cause (not symptom or effect
              指定的根本原因是真正的根本原因(不是表面现象
        _____ Occur or Process root cause has been established.
        _____ Occur and Escape root causes have been Verified.
             发生根本原因﹑制程中存在的问题或系统存在的问题已经被确认和验证.

D5 & D6 Verify and Implement Permanent Corrective Actions:
        _____ The dates of the actions are indicated.
              改善行动的日期已经指明.
        _____ The stated actions cover all occur or process root causes.
        _____ The stated actions cover all escape or system root causes.
              改善行动必须针对/涉及所有的根本原因﹒     
        _____ The actions adequately address the timing of the problem.
        _____ The actions adequately address the magnitude of the problem.
              明确表明问题发生的时间,问题的严重等级.
        _____ Inspection results since corrective action instituted listed.
              改善措施开始执行后的检验结果﹒
        _____ Validation: periodically re-validate.
              验证: 周期性的验证改善行动的有效性

D7 Prevent Recurrence:
        _____ The process FMEA was reviewed and revised (if applicable
              FMEA 是否已经review过﹐如果需要更新是否更新过.
        _____ Control plans were reviewed and revised (if applicable
              Control plan是否已经review过﹐如果需要更新是否更新过.
        _____ Process specifications were reviewed and revised.
              制程规格是否已经review过﹐如果需要更新是否更新过.
        _____ Added in-process inspection should not be listed as prevent recurrence method.
              增加检验不能算作改善措施﹐并且不要加入到预防改善行动中.
        _____ Audits should not be listed as prevent recurrence methods.
              稽核不要加入到预防改善行动中.

D8 Congratulate the Team
             通知小组成员已经完成本次8D 行动

使用高级回帖 (可批量传图、插入视频等)快速回复

您需要登录后才可以回帖 登录 | 加入

本版积分规则   Ctrl + Enter 快速发布  

发帖时请遵守我国法律,网站会将有关你发帖内容、时间以及发帖IP地址等记录保留,只要接到合法请求,即会将信息提供给有关政府机构。
快速回复 返回顶部 返回列表