VSM is the brief spelling of Value Stream Mapping which can be used for manufacturing process improvment like the Kaizen plan.
The major steps to implement the VSM are:
1. Identify the product
2. Create a current VSM status
3. Evaluate the current map, identify problem areas
4. Create a future state
5. Implement the final plan.
VSM is the systematic plan and effort and can be explained as the PDCA cycle.
欢迎光临 栖息谷-管理人的网上家园 (https://bbs.21manager.com.cn/) | Powered by Discuz! X3.2 |